Skip to content
Inovatif, profesional dan berkepribadian
facebook
youtube
instagram
Fakultas Teknik Terbaik di Medan Sumatera Utara
Call Support +62 823-7550-4150
Email Support [email protected]
Location Jl. Kolam No.1 Medan Estate
Jl. PBSI No.1 Medan Estate
  • HOME
  • PROFIL
    • Kata Sambutan
    • Sejarah
    • Visi dan Misi
    • Mars UMA
    • Pimpinan
    • Logo UMA
    • Struktur Organisasi
    • Lokasi Kampus
    • Denah
      • Denah Gedung Fakultas
      • Denah Kampus
    • Sarana
      • Laboratorium
      • Hall UMA
      • Asrama kampus
      • Bus Kampus
      • Sarana Olahraga
      • Masjid Kampus
      • Lokasi Parkir
      • Taman Hutan Raya
      • AIR Minum RO
      • Foodcourt Campus
      • Convention Hall
      • Rumah Kupu-Kupu
      • Perpustakaan
  • PROGRAM STUDI
    • Teknik Sipil
    • Teknik Elektro
    • Teknik Mesin
    • Arsitektur
    • Teknik Industri
    • Teknik Informatika
  • AKADEMIK
    • PENASEHAT AKADEMIK
    • Peraturan Akademik
    • Kalender Akademik
    • Kurikulum
    • Perkuliahan
      • Jadwal Kuliah
      • Jadwal Semester Antara
      • Jadwal UAS
      • Jadwal UTS
      • Jadwal Pengisian KRS
      • Jadwal Pembayaran Uang Kuliah
  • AKTIVITAS FAKULTAS
    • Kegiatan Fakultas
    • Prestasi Fakultas
  • ARSIP
    • Blanko / Formulir
    • Pedoman Lainnya
    • Arsip Berita
    • Peraturan Lainnya
    • Pengumuman
    • ARSIP UNDUH
  • APLIKASI
    • Pembayaran Online
    • Daftar Ulang
    • SAIS
    • SILIMA
  • LINK TERKAIT
    • Media Digital
    • Greenmetric
    • Direktori Mahasiswa S1/S2
    • BKMT UMA
    • Asrama Kampus
    • Pusat Komputer & Bahasa
    • PDAI
    • Sikuma
    • Wirausaha
    • Lipan
    • Repository
    • Jurnal Ilmiah
    • Hak Paten dan Hak Cipta
  • Kerja Sama
    • Nasional
    • Internasional
  • Helpdesk
  • Artikel

NASA Artemis I Moon Rocket released Days After Surviving storm, more than one Delays

Posted on November 18, 2020November 18, 2022 by admin
0

NASA launched the most effective rocket ever built on a adventure to the Moon on Wednesday, in a marvelous blaze of light and sound that marked the begin of the gap enterprise’s new flagship software, Artemis. The 32-story tall area launch gadget (SLS) blasted off from the storied Kennedy space middle in Florida at 01:47 am (12:17pm IST).

“we are going,” tweeted the distance agency.

constant to its top was the uncrewed Orion spaceship on the way to later separate and whole an orbit-and-a-half of Earth’s nearest neighbor, in a take a look at run for later flights that have to see the first girl and primary character of color contact down on lunar soil by using the mid-2020s.

america closing sent astronauts to the Moon throughout the Apollo generation, from 1969-1972. This time it hopes to build a sustained presence — including a lunar space station — to help put together for an eventual challenge to Mars.

The launch came despite technical troubles that ate into the 2-hour launch window that opened at 1:04 am (eleven:34am IST).

Engineers were compelled to pause the go with the flow of liquid hydrogen into the middle degree Tuesday night due to a valve leak, though a crew sent to the launch pad resolved the problem after an hour.

Later, the distance business enterprise mentioned that a radar web page tracking the rocket’s flight direction become experiencing issues due to a faulty ethernet transfer that had to be replaced.

It changed into 1/3 time fortunate for NASA after two previous release attempts were canceled for technical motives. launch become additionally not on time due to climate setbacks, which include hurricane Ian that battered Florida in past due September.

‘extraordinarily excited’

about one hundred,000 humans were expected at the coast to watch the launch, with the rocket promising to mild up the night time sky.

Andrew Trombley, a area fanatic from St. Louis, Missouri, changed into anxiously hoping for a successful liftoff after numerous futile journeys made for the release.

“i have been down right here multiple times already to look at this element move up and have it canceled, so, that is like, anything, the third trip down here for this, so i am excited to see it pass,” said the network engineer.

“i used to be too little for the Apollo missions, so … I wanted to be right here in character.”

Kerry Warner, 59, a grandmother and semi-retired educator who lives in Florida, become fired up for liftoff, which she said became “part of america and what america is all approximately.”

“0.33 time’s the charm. we’re hoping for it.”

some distance side of Moon

The Orion team pill turned into being lifted by means of two boosters and four powerful engines below the middle degree, which indifferent after only a few minutes.

After a very last push from the higher level, the tablet may be nicely on its manner, taking several days to attain its vacation spot.

rather than touchdown at the Moon, it will anticipate orbit, venturing 40,000 miles (64,000 kilometers) past the some distance side — similarly than any other liveable spacecraft to this point.

ultimately, Orion will embark on the return leg of its adventure. while passing thru the environment, the pill’s warmth protect will need to face up to a temperature 1/2 as hot because the solar’s surface.

The task will ultimate 25 and a 1/2 days, with a splashdown within the Pacific Ocean on December eleven.

NASA is banking on a successful mission after developing the SLS rocket for greater than a decade. it will have invested greater than $ninety billion in its new lunar program by means of the end of 2025, in step with a public audit.

Artemis 2 will contain a flyby of the Moon with astronauts in 2024, even as Artemis three will see boots on lunar soil, no sooner than 2025.

NASA has named its Moon assignment after the Greek goddess of the hunt, and the program objectives to ship human beings back to the Moon by 2025. The remaining time astronauts walked the floor of the Moon turned into in 1972, as a part of NASA’s Apollo assignment. The Artemis challenge finally plans to set up a base for astronauts on the Moon, beforehand of lengthy-time period plans to ship human beings to Mars.

Lihat postingan ini di Instagram

Sebuah kiriman dibagikan oleh Prodi Teknik UMA (@teknik_uma)

PENCARIAN

Berita Terbaru

Mahasiswa Teknik Sipil UMA Perdalam Pemahaman Bangunan Air melalui Field Trip ke Bendung Sei Ular
Medan, 29 Juni 2026 – Program Studi Teknik Sipil Fakultas Teknik Universitas Medan Area melaksanakan kegiatan Field Trip ke Bendung Sei Ular, yang berada...
Wisuda Periode I 2026, UMA Cetak Lulusan Kompetitif untuk Menghadapi Era Digital
Universitas Medan Area (UMA) kembali menegaskan komitmennya dalam mencetak sumber daya manusia yang unggul, adaptif, dan berdaya saing global melalui...
PMDK 2026 UMA: Langkah Awal Calon Wisudawan Menaklukkan Dunia Kerja Digital
Universitas Medan Area (UMA) melalui Biro Pengembangan Inovasi dan Karir (BPIKA) sukses menyelenggarakan kegiatan Persiapan Memasuki Dunia Kerja (PMDK) Periode 1 Tahun 2026 pada Kamis,...

Kaitan UMA

Lokasi Fakultas Teknik UMA

KAMPUS I
Jalan Kolam Nomor 1 Medan Estate / Jalan Gedung PBSI, Medan 20223
Telepon : (061) 7360168
Call Center : 0811-6013-888
KAMPUS II
Jalan Sei Serayu No. 70 A / Jalan Setia Budi No. 79 B, Medan 20112
Telepon : (061) 42402994
Call Center : 0811-6013-888
Copyright 2016-2026 © by PDAI UNIVERSITAS MEDAN AREA

PMB Teknik Mesin UMA 2026/2027